Industrial Installations · quoted per job

Industrial electricians in Crewe. Three phase work planned around your production.

Industrial work lives or dies on downtime. We plan shutdowns around your schedule, and we tell you honestly how long the power will be off.

  • NICEIC Approved Contractor
  • NICEIC Domestic Installer
  • NICEIC Rental Sector Scheme
  • Part P Registered

Industrial Installations, in plain terms.

Three phase distribution board

What it is

Three phase distribution, machinery connection and control, containment systems, and power distribution for workshops and light industrial units.

Who it is for

Workshops, light manufacturing, warehousing and units around Crewe and Cheshire East.

When you need it

New machinery, unit fitouts, capacity upgrades and relocations.

Why it matters who does it

Three phase carries consequences single phase does not, from rotation direction on a motor to discrimination between protective devices.

How we run it

Start to finish.

Fixed price or day rate, whichever suits the job, agreed with you up front.

  1. Site survey including existing capacity and available fault level.
  2. Scope and fixed price, with the shutdown window agreed up front.
  3. Install, with containment planned for future additions.
  4. Test, certify and label the distribution properly.
The detail

The specifics, for anyone who wants them.

Capacity before anything else

Adding machinery to a unit whose supply is already near its limit is the most common problem we are called to fix. We measure actual demand rather than adding nameplate ratings, and we tell you early if the DNO needs involving.

Discrimination

Protective devices should be graded so that a fault on one machine trips that machine, not the whole board. Getting this wrong turns a small fault into a full production stop.

Containment with room to grow

Tray and trunking sized only for today means the next install is a rip out. We size containment with spare capacity, which costs very little at the time.

Straight answers.

Can you work outside production hours?

Yes. Most shutdown work happens evenings or weekends by arrangement.

Do you do machine control panels?

Connection, modification and fault finding, yes. Full bespoke panel design is specialist and we will say so.

Can you upgrade our supply to three phase?

We will assess and handle the DNO application. Lead times are long, so start early.

Industrial in Crewe, priced properly.

Free written quote within 24 hours. Fully insured to £10 million. Every job backed by a workmanship guarantee.